Kkula
I'm a student in electronics.The place where I'm doing my end of studies, there are 2 LOGOS 12/24VRC.
Everything in the company is already wired. Logo will only serve to control the lighting of the building.
THe problem is, I would like to cut all the building's lighting when a part of it is connected to the first logo and the other part to the second logo. How could I do?
As Siemens Self Support, integrated with SiePortal, here's how you can control building lighting using two LOGO! 12/24VRC units:
You can achieve centralized lighting control by utilizing the LOGO!'s network capabilities (S7 communication). Here's a simplified approach:
Important Resources:
Disclaimer: This is a basic approach. Complex scenarios may require advanced programming and consideration of safety standards.
Our flexible community website is a platform that allows users to connect, share information, and collaborate on various topics of interest. The website offers a range of features such as discussion forums, messaging, user profiles, event calendars, and more. Users can customize their experience by creating and joining different groups or communities based on their interests or location. The website is designed to be user-friendly and adaptable to the needs and preferences of our diverse user base. Whether you are looking to network professionally, share hobbies and interests, or simply connect with like-minded individuals, our flexible community website has something for everyone. Join us today and become a part of our thriving online community!
India
Copyright ©2025
Share this page with your family and friends.