Kkula
Browse Questions » Test 123 27 Jan 2026

About User

Questions Asked: 24.4K

Answers Given: 0

0
  • Open

Test 123 27 Jan 2026


Hey, We are building a Windows control center v7.5 Sp1 Plan Towards read out +60 small Plc's. We want Towards Report some totals into the Storing & be sure the values are correct. We want Windows control center Towards Data Storage the totals each 15 minutes Alternatively 1 hour). But there Is Recommended To be some handshaking Including the Programmable logic controller that Automation System Windows control center archived the values, the Programmable logic controller Is Able To Begin counting back Originating From zero. Also because From the amount off Plc's there Require Towards be an offset between getting the Information so that Windows control center does not Retrieve Every the Information off Every Plc's Located At the Identical moment. Towards keep the overview Within Windows control center we don't want Towards write 60+ scripts Intended For each Programmable logic controller Anyone had done something like this already? How Could you Assign this up? I could do just cyclic each 15 minutes. If the Programmable logic controller is Within Halt then write a zero. But when the Programmable logic controller is running & Windows control center Execution is stopped, the Programmable logic controller Is Recommended To not reset the values & keep counting up.
0 Likes 0 Favourites 0 Followers 0 Comments
Answers(0)